Model Perhitungan Volume Pekerjaan Lambung Kapal Niaga

  • Dolok Joko Kencono Universitas Hang Tuah, Surabaya
  • Bagiyo Suwasono Universitas Hang Tuah, Surabaya
  • Ali Azhar Universitas Hang Tuah, Surabaya
Keywords: Efficiency, Work Volume, Hull Area, Commercial Ship

Abstract

Indonesia is a maritime country where most of its territory is in the form of oceans, so many people utilize its marine resources. The sea is currently widely used as a transportation medium for people and logistics using commercial ships. With so many commercial ships in Indonesia, the ship repair industry is also increasingly needed because it requires regular maintenance and repair according to the rules of ship classification. Hull repair treatment includes scraping, washing with fresh water, blasting (full blasting, sweep blasting, and spot blasting), painting, and replating (based on ultrasonic thickness test results). This research will focus more on container ships, bulk carriers, and oil tankers. In ship repair, the condition of the ship’s body, especially the hull, is the most critical concern. The calculation of the volume of hull work on each shipyard is different, making it difficult for the ship owner to estimate the repair time to be carried out. In this case, this study aims to determine the efficiency of the volume of hull repair work on commercial ships so that maintenance/repair work can run optimally. The method used is the calculation of Lloyd’s Registers with the Analytical Hierarchy Process (AHP). The analysis results show that the ship’s hull work is significantly different on the MT. Cosmic 15 because it has a difference in calculations from the shipyard with Lloyd’s, which is 203.636 m2. In the Analytical Hierarchy Process (AHP) analysis, the calculation of CR (Consistency Ratio) gets inconsistent results because the value is more than 0.1, namely 5.303. This is because of the data on the hull area of MT. Cosmic 15 is different in each shipyard where the ship docks.

Downloads

Download data is not yet available.

References

Priadi, A. A. “Dasar-dasar Penanganan dan Pengaturan Muatan Kapal Niaga”, Politeknik Ilmu Pelayaran Semarang. 2020.

Permatasari, D. A., Basuki, M., Kusuma, I. P. A. I. ”Analisa Penentuan Standart Waktu dan Biaya Pekerjaan Reparasi Kapal Menggunakan Metode Activity Based Costing”, Seminar Nasional Sains dan Teknologi Terapan V 2017, D63-D60. 2017.

Adha, F., Mulyatno, I. P., Kiryanto. “Optimalisasi Repair Schedule KN Panah P.207 dengan Critical Path Method guna Mempercepat Pengerjaan Repair”, Jurnal Teknik Perkapalan, 9(3), 314-323. 2021.

Fauzi, I., Ardhiansyah, F. “Analisis Kebutuhan Material Blasting dan Painting pada Reparasi Pengecatan Lambung Kapal Tongkang PSB 3002”, Jurnal Techno, 11(1), 50-58. 2024.

Armela, A. C., Amiruddin, W., Hadi, E. S. “Implementasi Project Evaluation and Review Technique (PERT) pada Penjadwalan reparasi Kapal KMP Royal Nusantara”, Jurnal Teknik Perkapalan, 10(2), 68-76. 2022.

Perbani, N. M. R. R. C., Rinaldy. “Penerapan Hitungan Volume Metode Simpson untuk Menghitung Volume Kapal dan Topografi Darat”, Jurnal Rekayasa Hijau, 1(2), 90-100. 2018.

Azmi, T. N. B. T. M., Deraman, M. S. B. “Mengukur Luas dan Isi Padu Kapal Kargo menggunakan Kaedah Simpson”, Journals of STEM & Education, 1(1), 86-93. 2021.

Rakasiswi, L. S., Badrul, M. “Penerapan Metode Analytical Hierarchy Process untuk Pemilihan Siswa Terbaik”, Jurnal PROSISKO, 7(1), 32-38. 2020.

Dwiono, A. S., Hendrawan, A., Pramono, S. “Perbaikan Lambung Kapal KM. Harima PT. CSFI-Cilacap”, Dinamika Bahari, 2(1), 56-61. 2021.

Boesono, H., Hidayati, N. R. “Analisis Keuntungan Usaha Dock Slipway san Dock Angkat di Pelabuhan Perikanan Samudera Nizam Zachman Jakarta”, Jurnal Saintek Perikanan, 3(2), 74-81. 2008.

Yamin, M. A., Yasim, A. “Analisis Proses Sandblasting dan Painting pada Lambung Kapal TK. Berkat 12 di PT. Adiluhung Saranasegara Indonesia”, Jurnal Inovtek Polbeng, 13(2), 171-178. 2023.

Ariany, Z. “Kajian Reparasi Pengecatan pada Lambung Kapal (Studi Kasus KM. Kirana 3)”, Teknik, 35(1), 27-32. 2014.

Permata, T., Manfaat, D., Ma’ruf, B. “Pemilihan Perusahaan Outsourching untuk Pembangunan kapal baru dengan Metode Analytical Hierarchy Process di Wilayah Gresik, Surabaya, Sidoarjo dan Mojokerto”, Jurnal Wave, 10(2), 47-52. 2016.

Published
2025-03-21
How to Cite
Kencono, D. J., Suwasono, B., & Azhar, A. (2025). Model Perhitungan Volume Pekerjaan Lambung Kapal Niaga. Saintara: Jurnal Ilmiah Ilmu-Ilmu Maritim, 9(1), 93-99. https://doi.org/10.52475/saintara.v9i1.383